Shangdong Electric Power Corporation: Transformer transportation to South Helwan, Egypt by Sea

Release date:2019-05-08

Cargo info:

14 sets of transformer, each dimension: 6.5M*4.5M*4.4M; gross weight: 183 Tons;

Delivered by break bulk heavy lift vessel, and all accessories are filled into 120 containers( including special containers and dangerous cargo).


Transit Solution:

The whole project were divided into 4 shipments, shipped from Shanghai and European ports to Egypt by sea, then shipped by road to the project site.


Service Scope:

(1)Handling all port documents, received cargo at the port, loaded onto the ship and despatched.

(2)Received cargo in Egypt port, arrange inland transit to the project site.